Basement Bathroom Construction
Location: Barrhaven, Ottawa | Year: 2022 | Typical Delivery Time: 3 weeks
Built a complete three-piece basement bathroom with plumbing, electrical, fixtures and finished surfaces. Coordinated the applicable framing, plumbing, electrical, ventilation, drywall and waterproof finish work as one integrated bathroom scope. Completed fixture installation, finish detailing and final trade adjustments to deliver a functional, clean and durable three-piece bathroom.
Basement Finishing with Walkout
Location: Kanata South, Ottawa | Year: 2024 | Typical Delivery Time: 10 weeks
Finished a basement, constructed a new walkout entrance and added two code-compliant egress windows. Delivered coordinated framing, mechanical, electrical, plumbing, insulation, drywall, flooring and interior-finish components within the documented basement footprint. Completed the defined rooms and service areas as an integrated multi-trade construction package, with circulation, storage and living functions coordinated across the layout.
Basement Bathroom and Closet Renovation
Location: Nepean, Ottawa | Year: 2024 | Typical Delivery Time: 3 weeks
Constructed a three-piece basement bathroom and coordinated closet improvements. Coordinated the applicable framing, plumbing, electrical, ventilation, drywall and waterproof finish work as one integrated bathroom scope. Completed fixture installation, finish detailing and final trade adjustments to deliver a functional, clean and durable three-piece bathroom.
Main-Floor Luxury Vinyl Flooring
Location: Orléans, Ottawa | Year: 2024 | Typical Delivery Time: 2 weeks
Removed existing carpet and resilient flooring, prepared the substrate and installed luxury vinyl plank flooring across the main floor. Completed removal of applicable existing finishes, substrate preparation and transition detailing before installation of the new flooring system. Installed and finished the flooring for consistent alignment, secure edges and a clean connection to adjoining rooms and trim.
Walkout Basement Finishing
Location: Stittsville, Ottawa | Year: 2024 | Typical Delivery Time: 8 weeks
Finished a basement and created a new exterior walkout entrance, including structural, mechanical and interior work. Delivered coordinated framing, mechanical, electrical, plumbing, insulation, drywall, flooring and interior-finish components within the documented basement footprint. Completed the defined rooms and service areas as an integrated multi-trade construction package, with circulation, storage and living functions coordinated across the layout.
Whole-Home Interior Painting
Location: Stittsville, Ottawa | Year: 2024 | Typical Delivery Time: 2 weeks
Prepared and painted the main floor and other interior areas for a refreshed, consistent finish. Completed surface preparation, protection of adjacent finishes and coordinated application to walls, trim and identified interior areas. Delivered a consistent finished appearance through controlled cutting, coverage and final touch-up work.